Home | Sitemap | Imprint
Deutsch
Chinese Russian Polish Hungarian

25 Years of CARD/1 in the field

The following projects have been planned with CARD/1

Yongwu – Heading up into the Interior

Yongwu motorway

Yongwu motorway

The entire motorway has four lanes

The entire motorway has four lanes

Vertical alignment

Vertical alignment

Contour lines

Contour lines

It will play a vital role in the development of the infrastructure and the economy of this rough mountainous region. The design institute used CARD/1 for this challenging project.

Complex Design

The entire motorway has four lanes. The standard cross-section RQ25.5 together with a design speed of 80km/h was used for 74km and 121km were designed using the standard cross-section RQ26 with a design speed of 100km/h. Despite the quick design process, the design quality never suffered.

Project facts:

  • A total volume of 30,355,000m3 had to be moved.
  • The asphalt surface is 3,255,000m2 and the concrete surface area is 512,000m2 in size.
  • Altogether, the 130 bridges are 37km long. 339 culverts for rivers and drainage facilities totalling a length of 19km had to be calculated. What’s more, 29 tunnels with an overall length of 29km, 11 intersections and 26 junctions with a total bridge length of 2.3km were part of the project.
  • 230 crossing facilities for pedestrians have been planned, 91 of which are below ground and 8 of which are footbridges with a total length of 546m. The safety facilities cover the entire length of the motorway.
  • 29,636 plans were produced for the design.
  • The construction costs are estimated to total approx. 12bn RMB, equivalent to 1.2bn Euro.

Client:

Fujian Sanmingyongwu Autobahn GmbH
Longyanyongwu Autobahn GmbH

Contractor:

Fujian Communication Planning and Design Institute
Jiaotong Strasse 43 Fuzhou
E-Mail fjjty(at)fjjty.com
Internet www.fjjty.com
Categories: Classified highway construction
Period: 2005 - 2006


Back to overview