The following projects have been planned with CARD/1
Yongwu – Heading up into the Interior
 Yongwu motorway
 The entire motorway has four lanes
 Vertical alignment
 Contour lines |
It will play a vital role in the development of the infrastructure and the economy of this rough mountainous region. The design institute used CARD/1 for this challenging project.
Complex Design
The entire motorway has four lanes. The standard cross-section RQ25.5 together with a design speed of 80km/h was used for 74km and 121km were designed using the standard cross-section RQ26 with a design speed of 100km/h. Despite the quick design process, the design quality never suffered.
Project facts:- A total volume of 30,355,000m3 had to be moved.
- The asphalt surface is 3,255,000m2 and the concrete surface area is 512,000m2 in size.
- Altogether, the 130 bridges are 37km long. 339 culverts for rivers and drainage facilities totalling a length of 19km had to be calculated. What’s more, 29 tunnels with an overall length of 29km, 11 intersections and 26 junctions with a total bridge length of 2.3km were part of the project.
- 230 crossing facilities for pedestrians have been planned, 91 of which are below ground and 8 of which are footbridges with a total length of 546m. The safety facilities cover the entire length of the motorway.
- 29,636 plans were produced for the design.
- The construction costs are estimated to total approx. 12bn RMB, equivalent to 1.2bn Euro.
Client:Fujian Sanmingyongwu Autobahn GmbH
Longyanyongwu Autobahn GmbH
Contractor:Fujian Communication Planning and Design Institute
Jiaotong Strasse 43 Fuzhou
E-Mail fjjty(at)fjjty.com
Internet www.fjjty.com
| Categories: |
Classified highway construction |
| Period: |
2005 - 2006 |
Back to overview
|