Home | Sitemap | Imprint
Deutsch
Chinese Russian Polish Hungarian

25 Years of CARD/1 in the field

The following projects have been planned with CARD/1

Re-routing the B36

Aerial photograph of Durmersheim

Aerial photograph of Durmersheim

Photo montage joint-route

Photo montage joint-route

Combining railway/road

Combining railway/road

Because of the high traffic load and the situation within the town it became necessary to relieve the municipalities Durmersheim and Bietigheim by building a bypass.

The new B36 bypass was planned and realized as a joint-route along with the extension/new route of the Deutschen Bahn AG (German Federal Railways). The inevitable environmental damage could therefore be reduced in comparison with independent routes.

One of the many strengths of CARD/1 is to integrate multiple planning areas. In the case of the joint-route planning where the dependencies between the new routes of the railway and the new national road had to be continuously checked, the system-wide data model clearly shows its advantage. This also applies to the drainage planning which is completely integrated into the project data.

Project facts:

  • Construction length of the continuous route: 9.7 km
  • Construction length of the crossing roads: 8 km Intersection points: 6 single level accesses to the crossing roads
  • Drainage system based on 5 seepage basins plus purification basins for rainwater with oil retention
  • Services: among others, design planning and execution planning of the traffic facilities; volumetric calculations

Client:

Regierungspräsidium Karlsruhe / Straßenbauamt Karlsruhe, Bauleitung Bühl

Contractor:

Mailaender Ingenieur Consult GmbH
Mathystrasse 13
76133 Karlsruhe

Phone +49 (0) 721/9 32 80 - 0
Fax +49 (0) 721/9 32 80 - 10
Email info(at)mic.de
Internet www.mic.de
Categories: Local transport & metropolitan trains Transport system networks
Period: 2001 - 2003


Back to overview