![]() Sewer base map of Winden ![]() Longitudinal profile |
The engineering office F&L GmbH planned the entire drainage facilities for the municipality of Winden in the Elztal region of Baden-Württemberg. The municipality contracted F&L to provide an overall approvable design of the future waste water and surface drainage facilities, taking state-of-the-art Logging the Existing ConditionsThe sewer network of the municipality of Winden consisted of various partial networks; the wastewater and the rainwater were mainly drained into a separated sewerage system or otherwise into a combined wastewater system. The surface water is drained into the river Elz, the wastewater and the combined wastewater are fed into the sewage treatment plant in Niederwinden. Hydraulic CalculationThe hydraulic calculation (performance and overload calculation) was run using variable runoff coefficients according to Prandtl-Colebrook and the precipitation values of the DWD (German Weather Service). This data was used to create alignment related sewer profiles to display the capacity utilization of the individual reaches of the sewer. The graphics immediately showed where there Separated Sewerage Systems for Rainwater and Combined WastewaterThe municipality of Winden has 2,855 inhabitants. Based on the total area of 55 hectares, the population density was determined. These values were used to calculate the wastewater sewerage system. There were also 765m of sewer exclusively used as a combined wastewater system in the district of Niederwinden. As it was not necessary to drain the rainwater portion in this combined wastewater system into the sewage treatment plant in Niederwinden, the municipality decided to introduce a separated sewerage system here. Thanks to the hydraulic calculations and the sewer profiles with two colour-coded capacity utilizations, or water level lines, it was possible to calculate the rainwater balance in the combined wastewater system. As the portion of the rainwater is now known, a rainwater sewer could be planned without any further calculations to reduce the amount of water drained into the wastewater sewer and the sewage treatment plant. One-stop JobThe results list with all input parameters, the sewer profile and the base map were part of the hydraulic calculation results. All plans were easily created based on reusable drawing specifications to create sewer base maps. When asked by the municipality, F&L not only visualized the overloads in the sewer profiles but also in the base map for a better overview. Project facts:
Client:Municipality of WindenBaden-Württemberg Contractor:Ingenieurbüro F&L GmbHBeratung - Planung - Bauleitung Gewerbestr. 5 79285 Ebringen Phone +49 (0) 7664 /97 04-0 Fax +49 (0) 7664 /97 04-99 Email info(at)f-ul.de Internet www.f-u-l.de
|