DB AutoZug Sylt Shuttle in Niebüll

Signposting/gantries ensure quick processing

Signposting/gantries ensure quick processing

New waiting area

New waiting area

Waiting area cross-section

Waiting area cross-section

Ditch piping with a DN 1000 pipe

Ditch piping with a DN 1000 pipe

The Sylt Shuttle facilities in Niebüll have been completely modernised to produce an advanced, customer-friendly product called DB Autozug Sylt Shuttle.

ICB Hamburg GmbH was awarded the contract to plan the re-development of the existing transport facilities (road/rail) and to modernise the existing level crossing.

Integrating the data of all those involved in the project was possible using DXF and DWG interfaces, meaning the entire plans were created at ICB Hamburg GmbH and all drawing data could be managed centrally by CARD/1 - just as any others involved in the terminal re-development were provided with exact data in the DXF and DWG data formats. Such was the straightforward cooperation between the local water management association, the public utilities and the department of building inspection.

CARD/1 showed its strength particularly in the area of data discipline: with its clear layer structure, special plans could be produced containing different information. Working with layers meant that for each single job, plans could be generated in such a way that they were never overloaded with information nor did they relegate important information to the background.

The DB AutoZug SyltShuttle transports all vehicles authorized by the StVO (German traffic regulations). As a result, the loading areas had to take the necessary turning circles and swept turning paths of any vehicle into account when positioning the waiting zones. ICB Hamburg GmbH's planners used CARD/1 for these calculations. The routes and interconnections between each waiting zone were all defined and displayed in the plans in order to determine the maximum required clearance space and position of traffic guidance systems (signposting/gantries, ticket machines, barriers).

 Project facts:

  • Construction volume 3 million euro
  • Scope HOAI phases 3 - 9
  • Planning schedule 08/2001 - 05/2003
  • Commissioning of terminal 04/2004

Client:

DB AutoZug GmbH
DB IMM

Contractor:

ICB Hamburg GmbH
Teilfeld 5
20459 Hamburg

Phone +49 (0) 40/3 74 93 4-0
Fax +49 (0) 40/3 74 26 23
Email hamburg(at)icb-gmbh.com
Internet www.icb-gmbh.com
Categories: Local traffic and city railways
Period: 2001 - 2004